| .. SPDX-License-Identifier: GPL-2.0 |
| |
| Linux kernel project continuity |
| =============================== |
| |
| The Linux kernel development project is widely distributed, with over |
| 100 maintainers each working to keep changes moving through their own |
| repositories. The final step, though, is a centralized one where changes |
| are pulled into the mainline repository. That is normally done by Linus |
| Torvalds but, as was demonstrated by the 4.19 release in 2018, there are |
| others who can do that work when the need arises. |
| |
| Should the maintainers of that repository become unwilling or unable to |
| do that work going forward (including facilitating a transition), the |
| project will need to find one or more replacements without delay. The |
| process by which that will be done is listed below. $ORGANIZER is the |
| last Maintainer Summit organizer or the current Linux Foundation (LF) |
| Technical Advisory Board (TAB) Chair as a backup. |
| |
| - Within 72 hours, $ORGANIZER will open a discussion with the invitees |
| of the most recently concluded Maintainers Summit. A meeting of those |
| invitees and the TAB, either online or in-person, will be set as soon |
| as possible in a way that maximizes the number of people who can |
| participate. |
| |
| - If there has been no Maintainers Summit in the last 15 months, the set of |
| invitees for this meeting will be determined by the TAB. |
| |
| - The invitees to this meeting may bring in other maintainers as needed. |
| |
| - This meeting, chaired by $ORGANIZER, will consider options for the |
| ongoing management of the top-level kernel repository consistent with |
| the expectation that it maximizes the long term health of the project |
| and its community. |
| |
| - Within two weeks, a representative of this group will communicate to the |
| broader community, using the ksummit@lists.linux.dev mailing list, what |
| the next steps will be. |
| |
| The Linux Foundation, as guided by the TAB, will take the steps |
| necessary to support and implement this plan. |